Quotations - For Work Undertaken on Fitzherbert Bridge
Two prints.
Identifier: PNCC 4/8/8:16:35
Date: 1934
Type: Map plan
Two prints.
From May 1933. General elevation of bridge. Progress of Piers. Piles - Casting and Driving. Progress of Superstructure. Colour-coded. Works copy. Office copy. Travelling copy. M H W No 7/516. Ye...
Identifier: PNCC 4/8/8:16:11
Date: 1933
Type: Map plan
Longitudinal sketches of bridge designs. Using both arched and flat - top architecture. Pencil on tracing paper and linen.
Drawings No 189, Maxweld. Proposals prepared by Phillip S Allen Consulting Engineer, Wellington. On behalf of the agents Messrs John Duthie and Co Ltd Wills Street, Wellington. Ink on tracing pa...
Identifier: PNCC 4/8/8:13:20
Date: 1933
Type: Map plan
Proposed bridge than was never built. S T Silver, Consulting Engineer, Wellington. Elevation of bridge. Plan of bridge, Typical cross sections, 13 November 1928, Linen original and blueprint.
Final plans on linen. Circa1898. By Henry H Metcalfe.
Damaged timber piles replaced with 3 pairs of cast – iron cylinders, filled with concrete
Manawatu River No 60 Main Highway. Yellow prints.
Yellow print.
Small linen plan. Fitzherbert Bridge - Manawatu River, No 60 Main Highway.
Small linen plan.
Coloured linen plan.
Manawatu River, No 60 Main Highway.
Manawatu River. Concrete deck for P and T Department. Two copies Yellow print.
Stamped M. H. W. No 518. 2nd set of blueprints of the Fitzherbert Bridge stamped M H W No 518 (copy of P W D 85115). Sheets 1 - 17, Sheet No 14 shows details of roller bearing and drain pipes.
Blueprints.
Sheets No 1 – 17 pinned together Sheet No1 Locality and site plan December 1932 Sheet No 2 General elevation December 1932 Sheet No 3 Plan and elevation Arch Span D to E, Dec...
Identifier: PNCC 4/8/8:14:1
Date: 1932 to 1933
Type: Map plan
The final design (approved in 1932) consisted of a reinforced concrete structure of 4 bowstring arches and 7 beam spans, making a total length of 839 feet high, the width of the carriageway 22 f...
Identifier: PNCC 4/8/8:13:1
Date: 1932
Type: Map plan
Final Drawings. PNCC plans.
Pencil on tracing paper and pencil on ink on linen c1931 – 1932. Proposed scaffolding – cross section and elevation. Proposed method of constrution of arch sp...
Identifier: PNCC 4/8/8:11:1
Date: 1882 to 1943
Type: Map plan
Preliminary drawing. Mostly pencil on tracing paper Circa1931.
Yellow print.
Longitudinal and cross sections. Drawing No 1. Henry H Metcalfe,
Between Palmerston North and Fitzherbert. P.W.D. 8956, Sheet 2.
Between Palmerston North and Fitzherbert. P W D 8955. H J Hayns, Officer in charge
P.W.D. 8957. Showing new span and new solid bank.
Amended method. See sheet No 10 of drawings. Yellow print.
Showing widths of spans, water level in river in October 1931 and flood level of August 1932, 1933?, Scale: 1 inch to 15 feet.
Layouts of 21 main and branches for new Fitzherbert Bridge. Yellow print.
Piers B and F. Yellow print.
Pier D. Yellow print.
Piers C and E. Yellow print.
Manawatu River No 60 Main Highway. Yellow prints.